Senegal - Bambey

Optical Data Requirements

Approximate Start Date of Acquisition: August (July preferred)
Approximate End Date of Acquisition: End of September (End of October preferred)
Spatial Resolution: 20m in XS and 1m in Pan mode
Temporal Frequency: 1 image per month
Latency of Data Delivery: 1 month
Wavelengths Required: B, G, NIR, R, Red Edge
Across Swath: N/A
Along Track: N/A

SAR Data Requirements

Approximate Start Date of Acquisition: August (July preferred)
Approximate End Date of Acquisition: October (November preferred)
Spatial Resolution: 1m
Temporal Frequency: 1 image per month
Latency of Data Delivery: 1 month
Wavelengths Required: stripNear_007R
Polarization Dual polarization: HH/VV
Incidence Angle Restrictions: Less than 25 degrees
Across Track: N/A
Along Track: N/A

©2015 Joint Experiment for Crop Assessment and Monitoring
© HER MAJESTY THE QUEEN IN RIGHT OF CANADA SA MAJESTE LA REINE DU CHEF DU CANADA (2015)