China - Jiangsu

Optical Data Requirements

Approximate Start Date of Acquisition: June 10, May shift slightly from one year to next due to changes in moisture/temperatures
Approximate End Date of Acquisition: October 25, May shift slightly from one year to next due to changes in moisture/temperatures
Spatial Resolution: 20m (min), 0.6m (preferred)
Temporal Frequency: 3 times over season (min), 6 times over season (preferred)
Latency of Data Delivery: weekly
Wavelengths Required: B,G,R,NIR
Across Swath: 40km (min), 60km (preferred)
Along Track: 40km (min), 60km (preferred)

SAR Data Requirements

Approximate Start Date of Acquisition: June 10, May shift slightly from one year to next due to changes in moisture/temperatures
Approximate End Date of Acquisition: October 25, May shift slightly from one year to next due to changes in moisture/temperatures
Spatial Resolution: 30m (min), 8m (preferred)
Temporal Frequency: 12 times over season
Latency of Data Delivery: weekly
Wavelengths Required: X, C and L
Polarization Full polarization (HH/HV/VH/VV)
Incidence Angle Restrictions: See the Incidence Angle in Preferred sensor
Across Track: 40km (min), 60km (preferred)
Along Track: 40km (min), 60km (preferred)

©2015 Joint Experiment for Crop Assessment and Monitoring
© HER MAJESTY THE QUEEN IN RIGHT OF CANADA SA MAJESTE LA REINE DU CHEF DU CANADA (2015)