China - Heilongjiang

Optical Data Requirements

Approximate Start Date of Acquisition: April 1 (min), March 15 (preferred)
Approximate End Date of Acquisition: Sep 10 (min), Sep 20 (preferred)
Spatial Resolution: 30 (min), 10 (preferred)
Temporal Frequency: 30d (min), 15d (preferred)
Latency of Data Delivery: weekly
Wavelengths Required: B,G,R,NIR (min), B,G,R,NIR, Red Edge band (preferred)
Across Swath: 70km (min), 100km (preferred)
Along Track: 70km (min), 100km (preferred)

SAR Data Requirements

Approximate Start Date of Acquisition: April 1 (min), March 15 (preferred)
Approximate End Date of Acquisition: Sep 10 (min), Sep 20 (preferred)
Spatial Resolution: 30 m (min), 10 m (preferred)
Temporal Frequency: 5 times over season
Latency of Data Delivery: weekly
Wavelengths Required: X, C and L
Polarization Dual (VV,VH) (min), Polarimetric (preferred)
Incidence Angle Restrictions: No restriction
Across Track: 70km (min), 100km (preferred)
Along Track: 70km (min), 100km (preferred)

©2015 Joint Experiment for Crop Assessment and Monitoring
© HER MAJESTY THE QUEEN IN RIGHT OF CANADA SA MAJESTE LA REINE DU CHEF DU CANADA (2015)